United Gas Pipe Line Co. v. Memphis Light, Gas, and Water Division, 358 U.S. 103 (1958), is a United States Supreme Court case in which the Court interpreted the Natural Gas Act of 1938 (NGA) as allowing a gas supply company to unilaterally modify a rate in a natural gas supply contract if the contract specified that the rate was that of the rate schedule filed with the Federal Power Commission (FPC) and the gas company filed a new rate schedule. This case clarified the Mobile-Sierra doctrine established by United Gas Pipe Line Co. v. Mobile Gas Service Corp. (1956) and its companion case Federal Power Commission v. Sierra Pacific Power Co. (1956), which holds that an electricity or natural gas supply rate established resulting from a freely negotiated contract is presumed to be "just and

AttributesValues
rdf:type
rdfs:label
  • United Gas Pipe Line Co. v. Memphis Light, Gas, & Water Division (en)
rdfs:comment
  • United Gas Pipe Line Co. v. Memphis Light, Gas, and Water Division, 358 U.S. 103 (1958), is a United States Supreme Court case in which the Court interpreted the Natural Gas Act of 1938 (NGA) as allowing a gas supply company to unilaterally modify a rate in a natural gas supply contract if the contract specified that the rate was that of the rate schedule filed with the Federal Power Commission (FPC) and the gas company filed a new rate schedule. This case clarified the Mobile-Sierra doctrine established by United Gas Pipe Line Co. v. Mobile Gas Service Corp. (1956) and its companion case Federal Power Commission v. Sierra Pacific Power Co. (1956), which holds that an electricity or natural gas supply rate established resulting from a freely negotiated contract is presumed to be "just and (en)
foaf:name
  • (en)
  • United Gas Pipe Line Co. v. Memphis Light, Gas, and Water Division, et al. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
Subsequent
  • Rehearing denied, (en)
dbp:wikiPageUsesTemplate
Dissent
  • Douglas (en)
JoinDissent
  • Warren, Black (en)
JoinMajority
  • Black, Frankfurter, Burton, Whittaker (en)
LawsApplied
  • National Gas Act, 15 U.S.C. ยง 717 et seq. (en)
ParallelCitations
Prior
USPage
USVol
ArgueYear
case
  • United Gas Pipe Line Co. v. Memphis Light, Gas, & Water Division, (en)
courtlistener
DecideDate
DecideYear
findlaw
fullname
  • United Gas Pipe Line Co. v. Memphis Light, Gas, and Water Division, et al. (en)
Holding
  • A gas company could may unilaterally modify a rate in a contract by filing a new rate schedule if the contract specifies that the rate is that on the rate schedule on file with the Federal Power Commission (en)
justia
Litigants
  • United Gas Pipe Line Co. v. Memphis Light, Gas, and Water Division (en)
majority
  • Harlan (en)
loc
has abstract
  • United Gas Pipe Line Co. v. Memphis Light, Gas, and Water Division, 358 U.S. 103 (1958), is a United States Supreme Court case in which the Court interpreted the Natural Gas Act of 1938 (NGA) as allowing a gas supply company to unilaterally modify a rate in a natural gas supply contract if the contract specified that the rate was that of the rate schedule filed with the Federal Power Commission (FPC) and the gas company filed a new rate schedule. This case clarified the Mobile-Sierra doctrine established by United Gas Pipe Line Co. v. Mobile Gas Service Corp. (1956) and its companion case Federal Power Commission v. Sierra Pacific Power Co. (1956), which holds that an electricity or natural gas supply rate established resulting from a freely negotiated contract is presumed to be "just and reasonable" and thus acceptable under the NGA or Federal Power Act (FPA). (en)
ArgueDateA
ArgueDateB
googlescholar
NotParticipating
  • Clark (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 38 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software