About: The Fifth (Des Moines)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Building, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FThe_Fifth_%28Des_Moines%29

The Fifth is a skyscraper under construction in Des Moines, Iowa. Developed by Mandelbaum Properties, upon completion in 2022, it will be the second tallest building in Iowa. The building will consist of a movie theater, hotel, parking garage, retail, and residential space. Construction started in late 2018 and is expected to finish at the end of 2022.

AttributesValues
rdf:type
rdfs:label
  • The Fifth (Des Moines) (en)
rdfs:comment
  • The Fifth is a skyscraper under construction in Des Moines, Iowa. Developed by Mandelbaum Properties, upon completion in 2022, it will be the second tallest building in Iowa. The building will consist of a movie theater, hotel, parking garage, retail, and residential space. Construction started in late 2018 and is expected to finish at the end of 2022. (en)
foaf:name
  • The Fifth (en)
foaf:homepage
name
  • The Fifth (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
architect
  • Solomon Cordwell Buenz (en)
caption
  • Rendering of The Fifth when completed in 2021 (en)
completion date
  • Late 2022 (en)
cost
developer
  • Mandelbaum Properties (en)
floor count
location
opening
roof
start date
status
  • Under Construction (en)
georss:point
  • 41.5852 -93.6231
has abstract
  • The Fifth is a skyscraper under construction in Des Moines, Iowa. Developed by Mandelbaum Properties, upon completion in 2022, it will be the second tallest building in Iowa. The building will consist of a movie theater, hotel, parking garage, retail, and residential space. Construction started in late 2018 and is expected to finish at the end of 2022. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
building end date
  • Late 2022
building start date
  • 2021
cost ($)
floor count
height (μ)
status
  • Under Construction
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-93.623100280762 41.585201263428)
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software