About: Queen Creek Tunnel     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FQueen_Creek_Tunnel

The Queen Creek Tunnel is a 1,217-foot-long (371 m) tunnel on US 60 in the Superstition Mountains, just east of Superior, Arizona. Completed in 1952, the Queen Creek Tunnel links Phoenix with Safford by way of Superior and Globe/Miami. It replaced the smaller Claypool Tunnel that had been built in 1926. The new tunnel was cut through the solid rock of the Queen Creek gorge, approximately 3 miles (4.8 km) from the 4,625-foot (1,410 m) mountain summit.. It is 22 feet (6.7 m) in height and 42 feet (13 m) wide at its base. The cost of the tunnel at the time of its construction was $550,000 and it was built by the Fisher Contracting Company.

AttributesValues
rdf:type
rdfs:label
  • Túnel Queen Creek (es)
  • Queen Creek Tunnel (en)
rdfs:comment
  • El Túnel Queen Creek​ (en inglés: Queen Creek Tunnel) es un túnel de más o menos un cuarto de milla de largo (400 m) del túnel en la ruta 60 de los Estados Unidos, al este de la localidad de Superior, en Arizona. Terminado en 1952, el túnel Queen Creek reemplazó al túnel Claypool, vinculando Phoenix con Safford por medio de Superior y Globe / Miami todos en Arizona. Una impresionante cascada se puede ver cerca cuando ha estado lloviendo. (es)
  • The Queen Creek Tunnel is a 1,217-foot-long (371 m) tunnel on US 60 in the Superstition Mountains, just east of Superior, Arizona. Completed in 1952, the Queen Creek Tunnel links Phoenix with Safford by way of Superior and Globe/Miami. It replaced the smaller Claypool Tunnel that had been built in 1926. The new tunnel was cut through the solid rock of the Queen Creek gorge, approximately 3 miles (4.8 km) from the 4,625-foot (1,410 m) mountain summit.. It is 22 feet (6.7 m) in height and 42 feet (13 m) wide at its base. The cost of the tunnel at the time of its construction was $550,000 and it was built by the Fisher Contracting Company. (en)
foaf:name
  • Queen Creek Tunnel (en)
name
  • Queen Creek Tunnel (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Pinal_County-Queen_Creek_Tunnel-Hwy_60_in_Pinal_County-1952-2.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
startwork
vpd
dbp:wikiPageUsesTemplate
thumbnail
traffic
  • Automotive (en)
height
image size
length
location
opened
owner
width
georss:point
  • 33.305 -111.08056
has abstract
  • El Túnel Queen Creek​ (en inglés: Queen Creek Tunnel) es un túnel de más o menos un cuarto de milla de largo (400 m) del túnel en la ruta 60 de los Estados Unidos, al este de la localidad de Superior, en Arizona. Terminado en 1952, el túnel Queen Creek reemplazó al túnel Claypool, vinculando Phoenix con Safford por medio de Superior y Globe / Miami todos en Arizona. Una impresionante cascada se puede ver cerca cuando ha estado lloviendo. (es)
  • The Queen Creek Tunnel is a 1,217-foot-long (371 m) tunnel on US 60 in the Superstition Mountains, just east of Superior, Arizona. Completed in 1952, the Queen Creek Tunnel links Phoenix with Safford by way of Superior and Globe/Miami. It replaced the smaller Claypool Tunnel that had been built in 1926. The new tunnel was cut through the solid rock of the Queen Creek gorge, approximately 3 miles (4.8 km) from the 4,625-foot (1,410 m) mountain summit.. It is 22 feet (6.7 m) in height and 42 feet (13 m) wide at its base. The cost of the tunnel at the time of its construction was $550,000 and it was built by the Fisher Contracting Company. At the 1952 dedication ceremony, a drill rig used in boring the tunnel was used as a platform for the speakers, other officials, and a brass band. The completion of the tunnel was the final part of an Arizona Highway Department program begun in 1937 to improve the original approximately 20-mile (32 km) section of US 60 between Superior and Miami that was constructed in 1920–22. The roadbed in the tunnel climbs at a 6% grade, and the original lighting was insufficient to allow motorists good depth perception. The original lighting was improved with the installation of fluorescent lights in the 1960s. Assistance in design of the new lighting was given by Arizona Public Service and the California Division of Highways. In October 2016, the tunnel lighting system was upgraded to light-emitting diode (LED) technology; it was the first tunnel in Arizona to get LEDs. The lighting system adjusts the lighting level based upon ambient light and weather conditions outside with an adaptive control system. The system offers improved visibility, reduced energy consumption, and lower maintenance. Arizona Department of Transportation (ADOT) plans to eventually widen US 60 in the area and may bypass the tunnel to avoid the impact of such a project on an environmentally sensitive canyon. (en)
grade
lanes
schema:sameAs
number of lanes
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
height (μ)
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software