The Nunn–McCurdy Amendment or Nunn–McCurdy Provision, introduced by Senator Sam Nunn and Congressman Dave McCurdy in the United States 1982 Defense Authorization Act and made permanent in 1983, is designed to curtail cost growth in American weapons procurement programs. It requires notification to the United States Congress if the cost per unit goes more than 25% beyond what was originally estimated and calls for the termination of programs with total cost growth greater than 50%, unless the Secretary of Defense submits a detailed explanation certifying:
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Amendement Nunn-McCurdy (fr)
- ナン・マッカーディー制度 (ja)
- Nunn–McCurdy Amendment (en)
|
rdfs:comment
| - ナン・マッカーディー条項(Nunn–McCurdy Provision)は、ナン・マッカーディー改正(Nunn–McCurdy Amendment)によりアメリカ合衆国の国防授権法(National Defense Authorization Act)に導入された条項。 (ja)
- L'amendement Nunn-McCurdy (Nunn-McCurdy Amendment ou Nunn-McCurdy Provision en anglais) est un mécanisme légal mis en vigueur par le gouvernement fédéral américain. Introduit pour la première fois dans un National Defense Authorization Act en 1982 par le sénateur Sam Nunn et le représentant (en) puis rendu permanent à partir de 1983, il est conçu pour réduire les surcoûts dans les programmes d'acquisition d'armes par l'armée américaine. (fr)
- The Nunn–McCurdy Amendment or Nunn–McCurdy Provision, introduced by Senator Sam Nunn and Congressman Dave McCurdy in the United States 1982 Defense Authorization Act and made permanent in 1983, is designed to curtail cost growth in American weapons procurement programs. It requires notification to the United States Congress if the cost per unit goes more than 25% beyond what was originally estimated and calls for the termination of programs with total cost growth greater than 50%, unless the Secretary of Defense submits a detailed explanation certifying: (en)
|
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
bot
| |
date
| |
fix-attempted
| |
has abstract
| - The Nunn–McCurdy Amendment or Nunn–McCurdy Provision, introduced by Senator Sam Nunn and Congressman Dave McCurdy in the United States 1982 Defense Authorization Act and made permanent in 1983, is designed to curtail cost growth in American weapons procurement programs. It requires notification to the United States Congress if the cost per unit goes more than 25% beyond what was originally estimated and calls for the termination of programs with total cost growth greater than 50%, unless the Secretary of Defense submits a detailed explanation certifying: 1.
* the program is essential to national security, that no suitable alternative of lesser cost is available; 2.
* new estimates of total program costs are reasonable; and 3.
* management structure is (or has been made) adequate to control costs. Congress normally regards the explanations from the Secretary of Defense as acceptable. It is unusual for a program to be cancelled as a result of notification, but it has led to many changes to project management. In 2006, the House of Representatives proposed amending the provision to require a detailed explanation, including information about possible alternatives, at the 15%-cost-growth mark. (en)
- L'amendement Nunn-McCurdy (Nunn-McCurdy Amendment ou Nunn-McCurdy Provision en anglais) est un mécanisme légal mis en vigueur par le gouvernement fédéral américain. Introduit pour la première fois dans un National Defense Authorization Act en 1982 par le sénateur Sam Nunn et le représentant (en) puis rendu permanent à partir de 1983, il est conçu pour réduire les surcoûts dans les programmes d'acquisition d'armes par l'armée américaine. Il exige que tout dépassement de coûts de plus que 15 % soit signifié au Congrès des États-Unis et exige la fin du programme si le surcoût total du programme dépasse de 25 % ou plus les coûts planifiés initialement, à moins que le secrétaire à la Défense des États-Unis ne soumette des explications qui démontrent que le programme est essentiel à la sécurité nationale, qu'il n'existe aucun substitut de moindre coût, que le nouvel estimé du coût total est raisonnable et qu'il existe des mécanismes de contrôle. Dans la pratique, très peu de programmes ont été annulés par le Congrès en invoquant cet amendement ; le Congrès accepte généralement les explications fournies par le Secrétaire à la Défense des États-Unis. Mais il a provoqué des changements dans plusieurs projets. Le programme SBIRS (système de défense spatial anti missile) a été ainsi modifié en 2002 et une deuxième fois en 2005. Les exigences auxquelles devaient satisfaire les satellites météorologiques NPOESS ont été revues à la baisse. En 2010 et 2011, les programmes de véhicules (en) (FCS) et Expeditionary Fighting Vehicle (EFV) de l'armée américaine ont été annulés en raison des surcoûts. (fr)
- ナン・マッカーディー条項(Nunn–McCurdy Provision)は、ナン・マッカーディー改正(Nunn–McCurdy Amendment)によりアメリカ合衆国の国防授権法(National Defense Authorization Act)に導入された条項。 (ja)
|
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |