About: Mumbai–Manmad Pipeline     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FMumbai%E2%80%93Manmad_Pipeline

The Mumbai Manmad Bijwasan Pipeline (MMBPL) was one of the most ambitious projects undertaken by BPCL [Bharat Petroleum Corporation Limited]. The project commenced in mid-1998 and involved the laying of a 252 km long petroleum product pipeline from Mumbai on the Arabian sea coast to Manmad, near Nashik, located in North-Eastern Maharashtra. Subsequently, by March 2007, the pipeline was extended from Manmad to near New Delhi's Indira Gandhi International Airport. The total length of the MMPL pipeline, reaching from Mumbai to the outskirts of New Delhi, is approximately 1,500 km.

AttributesValues
rdf:type
rdfs:label
  • Mumbai–Manmad Pipeline (en)
rdfs:comment
  • The Mumbai Manmad Bijwasan Pipeline (MMBPL) was one of the most ambitious projects undertaken by BPCL [Bharat Petroleum Corporation Limited]. The project commenced in mid-1998 and involved the laying of a 252 km long petroleum product pipeline from Mumbai on the Arabian sea coast to Manmad, near Nashik, located in North-Eastern Maharashtra. Subsequently, by March 2007, the pipeline was extended from Manmad to near New Delhi's Indira Gandhi International Airport. The total length of the MMPL pipeline, reaching from Mumbai to the outskirts of New Delhi, is approximately 1,500 km. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Mumbai Manmad Bijwasan Pipeline (MMBPL) was one of the most ambitious projects undertaken by BPCL [Bharat Petroleum Corporation Limited]. The project commenced in mid-1998 and involved the laying of a 252 km long petroleum product pipeline from Mumbai on the Arabian sea coast to Manmad, near Nashik, located in North-Eastern Maharashtra. Subsequently, by March 2007, the pipeline was extended from Manmad to near New Delhi's Indira Gandhi International Airport. The total length of the MMPL pipeline, reaching from Mumbai to the outskirts of New Delhi, is approximately 1,500 km. The details of pipeline sections are as under: Mumbai - Manmad - 18" x 252 km (approx.) long - Externally Coal tar enamel coated Manmad - Manglya - 14" x 350 km (approx.) long - Externally coal tar enamel coated (Note-1) Manmad - Piyala - Bijawasan - 18" / 8" - 750 km long - Externall 3 LPE coated. Note-1: Only Pipeline section across Narmada River of approx. 1000 m long was provided with 3 Layer PE Coated. In all the phases, M/s Engineers India Limited has been the Project Management Consultant responsible from concept to commissioning of the entire pipeline system. The MMBPL department of Bharat Petroleum is currently headed by Mr. L. R. Jain (CGM, Pipelines), Mr. Sehgal (General Manager, Operations - Product Pipelines) and Mr. S.K Agarwal (General Manager, ROU & HSSE - Pipelines). The MMBPL department has set high standards in the field of product pipelines. The experience in laying the Mumbai-Manmad-Bijwasan pipeline was utilised by Bharat Petroleum to lay a crude-oil pipeline from Vadinar on the West coast to Bina in Madhya Pradesh, where a new 6 million tonnes per year grassroot refinery was commissioned. The success achieved by the MMBPL department has made it almost certain that the pipeline department will become a "Strategic Business Unit" or SBU of Bharat Petroleum Corporation Limited in the near future. The latest cutting-edge technology is used for operations as well as maintenance works. Online monitoring of the status of the product and pipeline has been made possible by the use of SCADA (Supervision Control and Data Acquisition) Software. Advanced techniques are also employed in pigging operations. The department also conducts studies in various aspects of pipeline management, like minimizing interface, cathodic protection etc. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 53 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software