About: Gaviota Tunnel     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FGaviota_Tunnel

The Gaviota Tunnel (officially known as the Gaviota Gorge Tunnel) is a tunnel on U.S. Route 101 and California State Route 1 completed in 1953 in the center of Gaviota State Park, 33 miles (53 km) northwest of Santa Barbara, California on the Gaviota Coast. It is 420 feet (130 m) long and 17.5 feet (5.3 m) tall. Only the northbound lanes of US 101 pass through it, as the southbound lanes descend from Gaviota Pass through a narrow canyon to the west of the tunnel. Because it is the only major route between the Santa Barbara County South Coast and the Santa Ynez Valley, bicycles are allowed through it. There is a rest area for both southbound and northbound lanes on the southern end of the tunnel, the southernmost one along U.S. Route 101.

AttributesValues
rdf:type
rdfs:label
  • Gaviota Tunnel (en)
  • Túnel Gaviota (es)
  • Tunnel Gaviota (fr)
rdfs:comment
  • El Túnel Gaviota​ (en inglés: Gaviota Tunnel) es un túnel en la ruta 101 de EE.UU. completado en 1953 en el centro del parque estatal Gaviota, 33 millas (53 km) al noroeste de Santa Bárbara, California. Tiene 420 pies (130 m) de largo y 17,5 pies (5,3 m) de altura. Sólo los carriles hacia el norte de la Ruta 101 EE.UU. (El Camino Real) pasan a través de ella, mientras los carriles hacia el sur descienden del paso Gaviota a través de un estrecho cañón hacia el oeste del túnel. Debido a que es la única ruta principal entre la costa sur del condado de Santa Bárbara y el Valle de Santa Ynez, se permite que las bicicletas pasen a través de él. Hay una zona de descanso en el extremo sur del túnel, el más meridional a lo largo de la Ruta 101. (es)
  • The Gaviota Tunnel (officially known as the Gaviota Gorge Tunnel) is a tunnel on U.S. Route 101 and California State Route 1 completed in 1953 in the center of Gaviota State Park, 33 miles (53 km) northwest of Santa Barbara, California on the Gaviota Coast. It is 420 feet (130 m) long and 17.5 feet (5.3 m) tall. Only the northbound lanes of US 101 pass through it, as the southbound lanes descend from Gaviota Pass through a narrow canyon to the west of the tunnel. Because it is the only major route between the Santa Barbara County South Coast and the Santa Ynez Valley, bicycles are allowed through it. There is a rest area for both southbound and northbound lanes on the southern end of the tunnel, the southernmost one along U.S. Route 101. (en)
  • Le Tunnel Gaviota (officiellement appelé Gaviota Gorge Tunnel) est un tunnel de l'U.S. Route 101 (US 101) construit en 1953 au milieu du Gaviota State Park, à 53 km (33 miles) au nord de Santa Barbara, en Californie. Il mesure 130 mètres de long pour une hauteur de 5,3 mètres. Il est utilisé seulement par les voies orientées vers le nord, en effet dans l'autre sens l'autoroute emprunte une gorge étroite afin de franchir le Gaviota Pass. Il s'agit de la seule route entre le comté de Santa Barbara et la vallée de Santa Ynez, dès lors les automobilistes se doivent de partager la route avec des cyclistes. On trouve une aire de repos au sud du tunnel, il s'agit également de l'aire la plus méridionale de l'US 101. (fr)
foaf:name
  • Gaviota Tunnel (en)
name
  • Gaviota Pass (en)
  • Gaviota Tunnel (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Aerial-GavPassTunnel.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Gaviota-tunnel.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 43 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software