The Fuller Warren Bridge is the prestressed-concrete girder bridge that carries Interstate 95 (I-95) across the St. Johns River in Jacksonville, Florida. The current structure was finished in October 2002, replacing the original bascule-bridge span, finished in 1954. The current bridge was designed by HNTB Corporation in 1990 and built by Balfour Beatty Construction. It is over 7,500 ft (2,286 m) long, with a main span of 250 feet (76 m), and a vertical clearance of 75 ft (23 m). It carries eight lanes across the span.