About: Central Electricity Board     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatElectricityAuthorities, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCentral_Electricity_Board

The United Kingdom Central Electricity Board (CEB) was established by the Electricity (Supply) Act 1926. It had the duty to supply electricity to authorised electricity undertakers, to determine which power stations would be 'selected' stations to generate electricity for the board, to provide main transmission lines to interconnect selected stations and electricity undertakers, and to standardise generating frequency.

AttributesValues
rdf:type
rdfs:label
  • Central Electricity Board (en)
  • 中央電力庁 (ja)
rdfs:comment
  • The United Kingdom Central Electricity Board (CEB) was established by the Electricity (Supply) Act 1926. It had the duty to supply electricity to authorised electricity undertakers, to determine which power stations would be 'selected' stations to generate electricity for the board, to provide main transmission lines to interconnect selected stations and electricity undertakers, and to standardise generating frequency. (en)
  • 中央電力庁 (Central Electricity Board) は、電力供給を標準化するために、1926年電力(供給)法 (The Electricity (Supply) Act 1926) に基づき設置されたイギリスの機関である。当時、電力業界は600を超える電力会社と地方自治体の事業からなっており、地域によって電圧と周波数が異なっていた(直流の地域を一部含む)。初代長官はアンドルー・ダンカン。 CEBは、イギリス初の同期化された交流送電網(132kV、50Hzで通電)を確立した。1933年までのそれは地域的ネットワークの集合体であり、緊急時に連結し、イングランドの大部分をカバーしていた。この送電網は、1938年に全国的システム(全国高圧送電線網)として稼動を開始した。送電網が1947年電力法によって国有化され、英国電力公社に継承されると、CEBは廃止された。 CEBは、電力委員会(Electricity Commissioners:運輸省に対して責任を負う産業監査機関)と併置されていた。 (ja)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
area served
  • Great Britain (en)
defunct
fate
  • Industry nationalisation (en)
founded
  • February 1927 (en)
hq location
  • Trafalgar Buildings, 1 Charing Cross (en)
hq location city
  • London SW1 (en)
hq location country
  • United Kingdom (en)
industry
  • Energy: Electricity (en)
key people
  • See section in text (en)
num employees
num employees year
services
  • Regulation of electricity industry (en)
successor
text
  • Clippings about (en)
type
  • Government regulatory body (en)
georss:point
  • 51.46149833333333 -0.92643
has abstract
  • The United Kingdom Central Electricity Board (CEB) was established by the Electricity (Supply) Act 1926. It had the duty to supply electricity to authorised electricity undertakers, to determine which power stations would be 'selected' stations to generate electricity for the board, to provide main transmission lines to interconnect selected stations and electricity undertakers, and to standardise generating frequency. (en)
  • 中央電力庁 (Central Electricity Board) は、電力供給を標準化するために、1926年電力(供給)法 (The Electricity (Supply) Act 1926) に基づき設置されたイギリスの機関である。当時、電力業界は600を超える電力会社と地方自治体の事業からなっており、地域によって電圧と周波数が異なっていた(直流の地域を一部含む)。初代長官はアンドルー・ダンカン。 CEBは、イギリス初の同期化された交流送電網(132kV、50Hzで通電)を確立した。1933年までのそれは地域的ネットワークの集合体であり、緊急時に連結し、イングランドの大部分をカバーしていた。この送電網は、1938年に全国的システム(全国高圧送電線網)として稼動を開始した。送電網が1947年電力法によって国有化され、英国電力公社に継承されると、CEBは廃止された。 CEBは、電力委員会(Electricity Commissioners:運輸省に対して責任を負う産業監査機関)と併置されていた。 (ja)
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 43 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software