Cadishead Viaduct is a disused railway viaduct of multi-lattice girder construction. It was built in 1892 by the Cheshire Lines Committee to clear the newly built Manchester Ship Canal to carry the new deviation of the Glazebrook to Woodley Main Line. The central span is 40 yards (37 m) long, and the clearance is 75 feet (23 m). The route opened to goods on 27 February 1893 and to passenger traffic on 29 May 1893.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
sameAs | |
dbp:wikiPageUsesTemplate | |
thumbnail | |
spans |
|
bridge name |
|
builder | |
caption |
|
carries |
|
Closed |
|
crosses | |
image size |
|
locale | |
maint |
|
material |
|
open |
|
owner | |
georss:point |
|
has abstract |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
bridge carries |
|
closing year |
|
mainspan (μ) |
|
number of spans | |
opening date |
|
opening year |
|
builder | |
crosses | |
located in area | |
maintained by | |
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of |