About: CIBC Square     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Building, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCIBC_Square

CIBC Square (known during early stages of development as Bay Park Centre) is an office complex under construction in the South Core neighbourhood of Toronto, Ontario, Canada. The complex, located on Bay Street south of Front Street, is a joint development of Ivanhoé Cambridge and Hines. It will serve as the new global operational headquarters for the Canadian Imperial Bank of Commerce (CIBC), consolidating approximately 15,000 staff from several CIBC-tenanted buildings in the Greater Toronto Area, including its existing headquarters at Commerce Court. The complex also includes the Union Station Bus Terminal constructed on behalf of Metrolinx for GO Transit and other inter-city bus services, connected directly to Union Station. The complex will also include a one acre park elevated over the

AttributesValues
rdf:type
rdfs:label
  • CIBC Square (en)
  • CIBC Square (ru)
  • 加拿大帝国商业银行广场 (zh)
rdfs:comment
  • 加拿大帝国商业银行广场(开发早期被称为Bay Park中心)是位于加拿大多伦多市金融区南端,正在施工的办公综合体。该综合体建于Bay Street,坐落于Front Street以南,并特别以其租客加拿大帝国商业银行(CIBC)命名。这里将作为加拿大帝国商业银行新的全球总部,到时将汇聚大约15,000名员工,他们来自大多伦多地区几处该银行租用的办公楼,包括位于Commerce Court综合体的当前总部。 该综合体占地面积为2,900,000平方尺(270,000平方米),将由2栋49层的大厦组成,并分两阶段完成:南楼将替代原有停车场,并将全新GO运输公共汽车终点站纳入其中,计划于2020年启用。而北楼,将建于自治领公共大楼背面的现联合车站公共汽车终点站所在位置,将于2023年启用。两楼之间将由名为Sky Park的空中走廊连接,建于火车行使通道之上。 综合体的开发由Ivanhoé Cambridge和Hines共同负责,所用土地从都会联通(以及市政所有多伦多停车管理局的停车场)处购得,并由英国建筑事务所WilkinsonEyre和多伦多本地公司Adamson Associates共同设计完成。 2017年6月21日,在南楼破土仪式中,全新综合体名称对外宣布,即加拿大帝国商业银行广场。 (zh)
  • CIBC Square (known during early stages of development as Bay Park Centre) is an office complex under construction in the South Core neighbourhood of Toronto, Ontario, Canada. The complex, located on Bay Street south of Front Street, is a joint development of Ivanhoé Cambridge and Hines. It will serve as the new global operational headquarters for the Canadian Imperial Bank of Commerce (CIBC), consolidating approximately 15,000 staff from several CIBC-tenanted buildings in the Greater Toronto Area, including its existing headquarters at Commerce Court. The complex also includes the Union Station Bus Terminal constructed on behalf of Metrolinx for GO Transit and other inter-city bus services, connected directly to Union Station. The complex will also include a one acre park elevated over the (en)
  • «CIBC Square» (известный на ранних стадиях развития как Bay Park Center) — представляет собой строящийся офисный комплекс в Южном районе Торонто, Онтарио, Канада. Комплекс, расположенный на Бэй-стрит к югу от Фронт-стрит, является совместным проектом компаний Ivanhoé Cambridge и Hines. Комплекс также будет включать в себя парк площадью один акр, возвышающийся над железнодорожным коридором. (ru)
foaf:name
  • CIBC Square (en)
foaf:homepage
name
  • CIBC Square (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/CIBC_Square_from_Harbour_Street_-_20210314_(cropped).jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
address
architectural style
architecture firm
building type
  • Office complex (en)
developer
est completion
floor count
former names
  • Bay Park Centre (en)
groundbreaking date
image caption
  • CIBC Square, March 2021 (en)
location city
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 62 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software